波多野结衣精品中文字幕_segui88久久国产精品_日本免费一区尤物_国产亚洲精品美女久久久久久下载,爽到无码高潮喷水AV无码网站,国产精品亚洲欧美大片在线观看,久久国产高清一区二区三区

Welcome to Dongguan Haochen Hot Runner Technology Co., Ltd!
中文    EN

Haochen 20 years of focus on multimode cavities and small spacing hot runner

Service /


Mobile: 13712972461
Tel: 0769-85478528
400-0988-117
Fax: 0769-85478508
Email: [email protected]
Website: www.lijianxd.com
Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City
Industry NewsYour location: Home > News > Industry News

How much do you know about hot runner installation?

Publisher: Administrator Date: 2023-11-02

The heating module system in the mold cavity hot runner mold is a new type of structure that heats the flow channels and channels of traditional molds or three-piece molds, without the need to remove the flow channels and channels during each forming process. A typical hot runner system consists of the following components: main splitter plate, nozzle (NOZZLE), temperature controller, and auxiliary components.

The following also summarizes some precautions for installing hot runners:

1. Organize the mold, put down the upper mold, and clean all holes and templates.

2. Check the size and depth of each hole. Remove burrs from the template. At the same time, check whether the screw holes, center nails, and anti rotation pin holes of the ram have been processed.

3. Scan red lead at the hot nozzle sealing position and the upper step position to match the mold.

4. Test the hot head, then remove it and check if the 1st level sealant is in contact with the red lead, and if the 2nd level step is in contact with the mold. If not, please stop the installation and check for incorrect adjustments. Ensure tight fit and no leakage. Be careful not to get hurt during this process.

5. Install all hot nozzles while installing center pads, center pins, and anti transfer pins. Sweep red lead onto its surface.

6. Check the mouth position and center pad height, and control the error within 0.05mm.

7. Install the partition. Pay attention to the formal installation of the partition and avoid missing the hot nozzle sealing ring.

8. Check the fit between the splitter plate and the hot nozzle to ensure that all splitter plates and hot nozzles are in contact with red lead and there is no leakage of adhesive.

9. Arrange the wiring of the heat pipe nozzle to make it neat and aesthetically pleasing, and number each group of wires in sequence. Connect the line to the socket.

10. Place the separator plate into the assembly, lock the fixing screws of the splitter plate (pay attention to locking and balancing, so that the four corners of the splitter plate are consistent), and control the meson of the splitter plate to be higher than the surrounding area. The mold base plane is 0.10-0.15mm, and then the red lead is scanned onto the splitter plate meson.

11. Test the code template, check if the plane contacts the meson red line, and ensure that the template presses down on the splitter board meson.

12. Lock the mold, erect the mold, and check whether the matching between the gate and the end meets the requirements from the parting surface. It should be 0.1-0.2 millimeters lower than the surface of the main channel and should not tilt the center. Carefully check each circuit with a multimeter to ensure that there are no short circuits, open circuits, leakage or other phenomena in each circuit, and that each circuit corresponds correctly to ensure that each circuit is normal. Connect a thermostat for heating testing. Heating should be done within a 100 degree range for 10 minutes to preheat and dehumidify, protecting the heater. Then we heat it to the required temperature, and if you can arrange for the lifting mold to be tested normally.



Dongguan Haochen Hot Runner Technology Co., Ltd
Contact Us:
Mobile: 13712972461
Tel: 0769 85478528/400 0988 117
Fax: 0769-85478508
Email: [email protected]
Website: www.lijianxd.com
Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City

粵ICP備18086307號
CopyRight ? 2023 Dongguan Haochen Hot Runner Technology Co., Ltd. All Right Reserved.

Online
Service

ConsultationTime:9:00-18:00

Select customer service:

Hot
Line

400-0988-117
7*24H Service

Follow
Us

Website
TOP
主站蜘蛛池模板: 兴安盟| 靖宇县| 哈巴河县| 缙云县| 时尚| 巴中市| 永年县| 堆龙德庆县| 四川省| 南木林县| 友谊县| 浪卡子县| 郴州市| 大理市| 桐庐县| 常山县| 延长县| 德钦县| 宜宾县| 全州县| 高淳县| 无极县| 化隆| 红河县| 八宿县| 七台河市| 衡阳市| 舟山市| 嵩明县| 临湘市| 芦溪县| 乐东| 荥经县| 维西| 平南县| 东至县| 克拉玛依市| 牟定县| 吐鲁番市| 鄢陵县| 庄浪县|